This project was a mix of repair and new.
It required the stripping of the lower half of the existing OSB and cultured stone on the front of the house because of failure.
New OSB, water barrier, metal lath and mortar setting bed was installed followed by matching cultured stone.
Two columns supporting the roof over the front entrance of the home were also finished with cultured stone.
Cultured stone was also installed on the corners of the horse barn at the back of the property.