The property owner wanted a rock wall to fill in the space below the deck plus leave an under deck access opening.
The concrete supporting column and footing were to be integrated behind the new rock wall.
Cutting steps into the hill was done to extend the rockwork stairs to the level of the deck. The actual rockwork to extend the stairs was deferred to a later project.